      A brief analysis of the transformation process of coating production line
      Time:2012-10-22 11:51:38

             The painting production line of the complete machine is designed by the former First Design and Research Institute of machinery Industry, which adopts the advanced and mature industrial art in China at that time, and improves the mechanization and automation level of the painting production line, so as to improve the working environment and reduce the labor intensity of workers. At the same time, it has earnestly implemented the relevant state laws and regulations, norms and standards, and worked hard to do a good job in environmental protection and occupational safety and health.


             The whole production line by line, drying, screening, drying, paint on the surface and, offline 7 station such as composition, except on and off the five stations by an organic water drying room, shielding room, water spray paint room, flow flat room and dry room of a closed production line, and workshop is separated, ensures the whole paint areas relatively clean. In addition, a complete machine cleaning section is built at one end of the workshop for secondary cleaning of the complete machine. The whole machine adopts double board ground chain transportation to improve the mechanization level.


             Process flow: water gun oil removal cleaning -- on line -- hot air drying -- shielding -- surface paint spraying -- leveling -- drying -- removing shielding -- off line.


             The operation time of each station is 45min, and the cycle time of the pipeline can be adjusted appropriately according to the actual use.


             The paint varieties are komatsu yellow acrylic polyurethane enamel and the spray gun is electrostatic mixed air spray gun.


             The coating production line can produce 2000 loaders per year when only units are arranged for production. The total number of designers in the coating workshop is 24, including 16 production workers. The average annual output of each production worker is 142 loaders.


      Second, the question raises

             After 2003, due to the country to increase the investment in infrastructure, the loader industry into the good situation of flourishing production and marketing, several major loader production enterprises have reached their maximum output record. At the same time, each manufacturer has improved the appearance quality. The paint is mainly used to color the loader. The loader's appearance color is divided into two parts, which changes the loader's single color for a long time.


             With the increase of loader output and the extensive use of exterior paint color registration, several problems occurred in the application process of complete machine coating line:

             (1) the surface spray paint tinted homework makes loader shorter time () down on a painting area, and screen instead of to shorten the time, and extension of trend, make the whole assembly line beat changed, when in low yield, but increased the waiting time for some station, yield increase and then need to be partially blocked work offline.

             (2) Due to the shortened beat of the entire production line, there is a heating process in the water mark drying room, so that the temperature just rises to the specified temperature and sometimes even does not rise to the specified temperature, it needs to be transferred to the next station, which cannot play a role at all. However, the water mark drying room is a pass-through type, and the temperature immediately drops to the ambient temperature after the door is opened.

             (3) The drying room also has the same problem as the water mark drying room, which cannot give full play to the drying role.

             (4) The door of each chamber adopts pneumatic door, the time of switch is long, fully open or completely close is about 3-5min, in the whole beat is long (45min), do not feel, after the beat is shortened it seems a little too long.

             (5) the utilization rate of the waste gas treatment device is too low, because the exhaust gas in the paint room is fully mixed with water, and the air volume is large, so the organic solvent content discharged into the atmosphere can meet the emission standards. The drying chamber USES the hot air circulation, a small part of the exhaust gas emissions, this small part of the exhaust gas may exceed the standard, so most of the production lines have added activated carbon adsorption device.


      3. Suggestions for improvement

             It is impossible to solve the above problems by using the current intermittent pass-through production line. To completely solve the above problem, only fundamentally change the production line type, or like a car factory adopted by type production line, continuous operation, every room body is longer, the whole production line without door, drying room a preliminary drying and strong cold area, and use the wind curtain interception heat, or use the Chambers and decorate, a spray room with 2-3 drying room, loader into the drying chamber immediately after spray paint, flat, drying in the process of heating up, some large-scale passenger car manufacturer both in this way.


      Iv. Practical operation

      With the increasing production of loaders, the measures taken by our company are as follows:

             1) After cleaning and removing oil, the loader should take the way of natural cooling and drying, pay attention to maintain balanced production, if the weather is bad, use the night time to dry.

             (2) When the production line is in operation, the water-mark drying room does not work, and most of the shielding work is carried out offline.

             (3) All the doors of the room are closed when painting, in order to save time. In this way, it is easy to cause the paint mist to fly to the shielding room and leveling room next to the paint room.

             (4) A new 720m2 hangar will be built for parking the loader sprayed with paint, and the painting and decoration work will be carried out here; When the temperature is low, use the evening time to dry.

             (5) Make some baffles of shield glass with tin sheet to save the time of shield glass.

          

             Through the above measures, the company has ensured the painting workshop in the case of no night shift, Nissan 15-20 loaders. Of course, the above measures are a little harmful to the production line. In order to improve the problem of drying in winter, the company plans to build a new drying room for drying the paint of the whole machine, and prepare to move the water-mark drying room below the line to play its role.

      Service hotline

      020-36860788

      WeChat

      Feedback

      Feedback

      主站蜘蛛池模板: 亚洲AV日韩AV无码A一区| 人妻碰碰碰| 亚洲欧美偷国产日韩| 99久热在线精品视频| 人人爽人人爽人人片av免费| 亚洲综合色自拍一区| 日本欧美大码a在线观看| 欧美成人综合| 26uuu欧美日本| 人妻无二区码区三区免费| 中文在线天堂中文在线天堂| 国产AV巨作丝袜秘书| 亚洲欧美日本全免费| 亚洲AV无码国产精品色午夜软件| 国产精品综合av一区二区国产馆 | 男人天堂网熟女| 亚洲VA中文字幕无码毛片春药| 国产精品永久在线观看| 天堂v亚洲国产v第一次| 亚洲粉嫩av一区二区黑人| 亚洲欧美日韩在线观看高清| 美女扒开尿口让男人桶| 亚洲国产粗大| 家庭激情网| 91在线播放免费不卡无毒| 亚洲自偷自拍熟女另类| 国产又大又粗| 在线观看亚洲欧美日本专区 | 人人妻人人狠人人爽| 91色老久久精品偷偷性色| 狼综合网| 国产又色又刺激高潮视频| 亚洲制服丝袜在线| 国产成人av一区二区三| japanese无码中文字幕| 狠狠色噜噜狠狠狠狠2018| 人妻无码中出| 亚洲一本大道在线| 久久国产精品免费99| 99精品国产在热久久婷婷| 免费观看污网站|